Water Mains Replacement

Project Name:
Ashton Keynes
Water Mains Replacement

Client: Thames Water

Requirements:
Install a 560mm water pipe under 2 ditches and crossing the river Thames terminating in a field from the road

Ground Conditions:
Grey Clay

Length:
256m

Obstacles:
2 x ditches with culvert structures and the River
Thames

Machine Equipment:
American Auger DD10 (20ft)
Rod (50T Rig)

Duration:
4 days (10hrs shifts)